US Interconnection Queue

Where new power is waiting to connect — queue size, fuel mix, and market signals across ISO/RTO territories.

Queued

1.46 TW

Projects

7,790

Markets

7

Updated 2026-06-06

ERCOT
MISO
PJM
CAISO
SPP
NYISO
ISO-NE

What's happening

The US interconnection queue totals 1.46 TW across 7,790 active projects. Queues are dominated by renewables and storage, but study timelines, withdrawal rates, and large-load demand vary sharply by ISO.

Updated 2026-06-06

US queue total
1455 GW
7,790 active projects across 7 ISO/RTO markets
Leading technology
Solar
29% of queued MW nationally
Clean + storage share
70%
Solar, wind, storage, hydro, geothermal, and nuclear
Largest queue by MW
ERCOT
427 GW · Texas
Most projects
PJM
2,296 requests · avg 135 MW
Large-load signal
ERCOT
Large-load applications continue to stay elevated

Projects by state

Shaded states fall in a tracked ISO/RTO footprint (overlaps shown in tooltips) or have projects in our data. Gray states are outside coverage (e.g. Southeast, WECC). Tap a state for counts.

Scale (covered states)

01,847
Utility-scale solar and wind generation across open landscape

Why this matters

  • Interconnection queues are the bottleneck for new generation and large loads. MW sitting in queue ≠ MW getting built — study timelines and withdrawal rates determine what actually connects.
  • Fuel mix shows where the grid is headed: solar, wind, and storage dominate most queues, but gas and hybrid projects still account for meaningful capacity.
  • ISOs run different processes. PJM's transition cycle, ERCOT's large-load queue, and MISO's reliability rules can matter as much as the raw project list.

Queue by market

Capacity, fuel mix, and project counts from live ISO feeds. Select a market to explore projects.

Other queue signals

Large-load demand, post-reform cycles, and report-only queues that aren't in the standard generator tables.

  • ERCOT · Large load

    Large-load applications continue to stay elevated

    ERCOT's 2026 annual report says the large-load interconnection queue contained roughly 400 requests totaling about 239 GW-equivalent demand.

    239.0 GW400 requests
    ERCOT Annual Report - 2025
  • MISO · Large load

    Large-load reliability rules are being defined

    MISO's public dashboard shows active work on large-load interconnection reliability requirements, including ramping, ride-through, and modeling criteria.

Project lookup

Search individual queue entries when you need a specific project, ID, or status.